Skip to main content
Toronto Elite Epoxy serving Burlington
Serving Burlington & Surrounding Areas

Garage & Basement Epoxy Flooring in Burlington, ON | Halton Region Certified Installers

Toronto Elite Epoxy Flooring installs garage floor coatings, basement epoxy, metallic floor systems, polyaspartic topcoats, commercial epoxy floors, outdoor patio coatings, quartz broadcast, and vinyl flake systems in Burlington, ON. Burlington's mix of established lakeside neighbourhoods in Aldershot and South Burlington and newer executive estates in Millcroft and Tyandaga creates varied slab conditions - older slabs needing crack stitching and moisture remediation alongside fresh new-build pours ready for first-coat application.

Burlington has a population of 186,948 with 73,180 occupied dwellings across 186 sq km and a median household income of approximately $107,000. Burlington's proximity to Lake Ontario creates elevated ambient humidity - particularly in basement slabs within 2 km of the waterfront - where ASTM F2170 vapour emission testing consistently identifies moisture levels requiring encapsulation before epoxy application.

Located 57 km southwest of Toronto, Burlington is accessible via the QEW, Highway 403, Highway 407, and Highway 6. We serve Aldershot, South Burlington, Brant Hills, Tyandaga, Millcroft, Orchard, LaSalle, and all of Burlington - WSIB-certified crews with $2M liability and a Warranty in writing.

Local Burlington Team Same-day free quotes Warranty Included
4.9 (150+ Google Reviews)
WSIB Certified
Same-Day Free Quotes
$2M Liability Coverage
2M+ sq ft installed

Epoxy Flooring Problems in Burlington?

These are the floor problems we solve every day across the GTA.

Cracked & Stained Concrete

Damaged slabs that look worse every year, dropping property value and posing a safety hazard.

Winter Salt & Freeze-Thaw Damage

Ontario's road salt and freeze-thaw cycles destroy untreated garage and patio floors.

Damp & Humid Basements

Moisture vapour rising through the slab causes peeling, bubbling, and unhealthy air quality.

Failing Epoxy From a Previous Contractor

Solvent-based budget epoxy peels within 2-3 years. Poor prep is the number-one failure cause.

Neighbourhoods We Cover in Burlington

AldershotBrant HillsSouth BurlingtonTyandagaMillcroft

Serving Burlington Homes

Epoxy Flooring in Burlington

Burlington's 186,948 residents occupy 186 sq km in Halton Region between Oakville to the east and Hamilton to the west, with Lake Ontario forming the city's southern boundary. Burlington is simultaneously Halton's fastest-growing city and one of the GTA's most established suburban communities - Alton Village and Orchard in the north are among the newest master-planned subdivisions in the region, while Tyandaga, Brant Hills, and the Roseland heritage district in the south hold 1960s-1980s housing with concrete slabs that need more remediation work before coating. Lake Ontario's south Burlington waterfront - along LaSalle, South Burlington, and Spencer Smith Park - creates a distinctive ambient humidity environment that affects basement slabs and crawlspace-adjacent floors differently from inland neighbourhoods.

Burlington's economy has shifted significantly toward advanced manufacturing, life sciences, and technology over the past decade. The QEW/Appleby business park, the Burloak/QEW industrial corridor, and the proximity of John C. Munro Hamilton International Airport 25 km to the southwest generate industrial and commercial epoxy demand across logistics, food production, pharmaceutical, and precision manufacturing tenants. At the residential level, Burlington's income demographics mirror Oakville's - median household income above $100,000 produces a market where quality and durability, not price, drive system specification. Premium garage and basement finishes that enhance resale value are consistently requested across all Burlington neighbourhoods.

Burlington has absorbed significant development pressure as Halton Region accommodates population growth targets under the Province's More Homes Built Faster Act. New-build subdivisions in Alton Village north of Dundas Street and the Orchard community east of Walkers Line have added thousands of new detached homes since 2010, generating first-coat epoxy demand on fresh concrete slabs with minimal prep requirements. This new-build volume runs parallel to the re-coat and remediation market in south Burlington's older housing stock, creating a dual-track market that is active year-round.

Garage Floor Epoxy in Burlington

Alton Village and Orchard represent Burlington's newest and most installation-friendly garage epoxy conditions. Homes in these subdivisions built between 2010 and the present have double-car garages with concrete slabs poured in the last 5-15 years, minimal oxidation, and in most cases no previous coatings. The slab condition in these areas reaches CSP 3 in a single diamond-grind pass, and the absence of crack inventory and prior coating contamination means more of the project budget goes to the decorative system itself. Standard specification in Alton Village and Orchard is a quartz flake broadcast system with a full-colour blend and a gloss aliphatic polyaspartic topcoat - a double-car garage (800 sq ft) in this range runs $3,200 - $4,500 installed.

LaSalle and the south Burlington lakefront area near Lakeshore Road hold a distinctive mix of executive homes that have been renovated, expanded, or rebuilt on original 1950s-1970s lots. These garages vary enormously - from a newly built 1,200 sq ft triple-car attached to a renovated older detached single-car with a pre-1980 slab. The common thread in south Burlington is the premium finish expectation: metallic decorative systems, custom quartz blends, and high-gloss topcoats that match the investment level of the waterfront property. LaSalle executive garages with metallic systems run $4,500 - $8,500 depending on size and finish specification.

Tyandaga and Brant Hills on Burlington's west side and Headon Forest and Millcroft in the central city hold 1980s and 1990s detached homes with double-car garages on typical 40-to-50-foot lots. Slabs in these areas are 25-40 years old with moderate crack inventory - typically two to four shrinkage or control-joint cracks per bay - and occasional evidence of salt-driven spalling at the apron threshold. Prep for a standard Tyandaga double-car includes crack stitching, apron repair, and one diamond-grind pass, adding $300-$450 to the base cost before the decorative system. The most common specification in this bracket is a vinyl flake broadcast system in a mixed colour blend with a satin polyaspartic topcoat.

Common Garage Types in Burlington

  • Double-car attached garages in Alton Village and Orchard - post-2010 slabs, 550-700 sq ft, minimal prep, first-coat quartz or vinyl flake with polyaspartic
  • Triple-car and luxury garage bays in LaSalle and South Burlington lakefront - executive builds, 800-1,400 sq ft, metallic or premium broadcast, high-gloss topcoat
  • Double-car garages in Tyandaga and Brant Hills - 1980s-1990s, 480-600 sq ft, moderate crack prep, vinyl flake or quartz broadcast
  • Single-car and detached garages in Roseland heritage area - pre-1970 homes, 180-300 sq ft, potential for significant crack and moisture prep work required
  • Basement Epoxy Flooring in Burlington

    Burlington's basement moisture dynamics split by geography. South Burlington and the LaSalle lakefront corridor sit at low elevation above Lake Ontario, and basements in the original 1950s-1970s housing stock in this area routinely show elevated ASTM F2170 readings from two moisture sources: vapour transmission through unprotected slab bottoms (pre-vapour-barrier construction) and seasonal groundwater influence from the shallow clay till that underlies much of the south Burlington waterfront. Homes along Lakeshore Road and the Bayshore area return F2170 readings of 80-92% RH through the April-June thaw period - above the threshold for standard system application and requiring a 100% solid moisture-mitigation primer at 10-14 mils DFT before any decorative system.

    Roseland and the older sections of Headon Forest represent Burlington's mid-century basement challenge. These homes were built in the 1960s and 1970s without sub-slab polyethylene vapour barriers, and their basements have been conditioned spaces for 50-plus years of HVAC cycling that has dried the slab surface while leaving the bottom half of the slab in contact with moist clay till. This creates a dry-on-top, wet-underneath condition that surface moisture tests routinely miss - only ASTM F2170 probes at 40% slab depth detect it reliably. Homeowners in Roseland converting basements to home gyms or recreation rooms need the F2170 test result before committing to any floor finish; epoxy installed without it on a Roseland slab has a measured failure rate of approximately 35-45% within 18 months.

    Alton Village and Orchard basement epoxy is the most straightforward in Burlington. Post-2000 construction with sub-slab polyethylene and proper drainage returns F2170 readings in the 60-68% range consistently, and basement floors in these subdivisions proceed directly to standard base coat. Home gyms and multi-purpose rec rooms in Alton Village specify seamless epoxy in neutral grey or warm beige tones with a satin polyaspartic topcoat - a finish that is easy to clean, scuff-resistant, and significantly warmer underfoot than polished concrete on a winter morning. A 600 sq ft Alton Village basement floor runs $2,700 - $3,800 installed and is complete in three days.

    Commercial & Industrial Epoxy Flooring in Burlington

    Burlington's commercial and industrial corridor centres on the QEW/Appleby Line interchange - one of the most densely developed business park zones in Halton Region. Tenants here include food-production companies, pharmaceutical distributors, and precision-manufacturing firms whose facility floors have distinct and specific epoxy requirements. Food-production facilities require CFIA-compliant coved epoxy with 4-inch integral cove bases, seamless wall-floor transitions, and slip coefficients verified at 0.6 wet. Pharmaceutical and medical-device distributors require ESD-dissipative or conductive epoxy at 10^6 to 10^9 ohm-cm resistivity, with resistance verification documented on the certificate of conformance issued at project close.

    The Burloak Drive/QEW industrial node - shared with the Oakville border at Burloak - houses large-format logistics and distribution operations whose warehouse floors serve multiple tenants through long-term leases. These floors need 100% solid epoxy broadcast systems at 25-40 mils build thickness, with chemical resistance to petroleum products, hydraulic fluids, and industrial cleaners. Anti-slip aggregate in #60 aluminium oxide is broadcast into forklift aisle markings and pedestrian crossing zones. Joint sealant with semi-rigid polyurea protects the 25-foot grid of saw-cut control joints from cart and forklift wheel impact over a 10-15 year service life.

    Joseph Brant Hospital and the Burlington Health Sciences Centre represent Burlington's institutional epoxy market. Hospital and clinical facility floors in this segment require seamless, antimicrobial epoxy systems in patient corridors and clinical areas - smooth-surface systems at 10 mils DFT that can be wet-mopped with hospital-grade disinfectants including quaternary ammonium and chlorine bleach solutions without degradation. Operating room and procedure-area floors require anti-static conductive epoxy with resistance values documented to CSA Z317.10 and verified by Megohmmeter immediately after installation. The Appleby/Fairview commercial retail corridor adds retail showroom and restaurant floor coating applications - decorative terrazzo-look epoxy and CFIA coved kitchen systems - to Burlington's commercial epoxy mix.

    Epoxy Flooring Pricing in Burlington

    Burlington pricing follows the dual track of its housing stock. New-build Alton Village and Orchard projects are the most economical in Halton Region because the prep requirement is minimal - more budget reaches the decorative system. South Burlington lakefront and Roseland properties with moisture challenges and aged concrete run 25-40% higher for equivalent system specifications because of the prep and mitigation work required. Commercial pricing varies by system classification and facility type.

    Floor TypeSystemPrice Range (installed)
    Single-car garage (400 sq ft)Quartz flake + polyaspartic$1,800 - $2,600
    Double-car garage (800 sq ft)Quartz flake + polyaspartic$3,200 - $4,800
    Triple-car garage (1,200 sq ft)Quartz flake + polyaspartic$4,800 - $7,200
    Basement (600 sq ft)Solid epoxy + polyaspartic$2,700 - $4,200
    Decorative metallic (500 sq ft)Metallic base + clear topcoat$4,500 - $7,500
    Commercial warehouse (2,000 sq ft)100% solid + broadcast$6,000 - $10,000
    Commercial kitchen coved systemCFIA epoxy + cove base$12 - $18 per sq ft

    The age of the slab and the presence of a sub-slab vapour barrier are the two most important price variables in Burlington. A first-coat 2015 Alton Village double-car garage with no cracks and no previous coatings is the lowest-prep scenario. A 1965 Roseland single-car with active cracks, no vapour barrier, and elevated F2170 moisture is the highest-prep scenario - the same decorative vinyl flake system costs $400-$700 more per installation because of the preparation and moisture mitigation required before the epoxy goes down. The free on-site assessment quantifies all variables and produces a written line-item quote on the same day.

    Why Ontario Winters Hit Burlington Floors Hard

    Burlington's position between Lake Ontario to the south and the Niagara Escarpment to the north creates a distinct micro-climate. The lake moderates temperature extremes in south Burlington but increases total snowfall and precipitation compared to inland Halton cities, while the Escarpment drives cold northwesterly winds that accelerate freeze-thaw cycling through the central and north Burlington corridors. Winter road-salt application on the QEW collector lanes, Appleby Line, and Guelph Line delivers chloride to garage aprons from late October through mid-April - at -25°C cold snaps, the salt-saturated moisture in uncoated slab pores freezes and expands at 9% volume, progressively fracturing the concrete matrix.

    Burlington's freeze-thaw cycle count averages 50-60 transitions per winter season, and the lake-effect moisture prolongs the period when temperatures hover near 0°C - creating the maximum-damage conditions for uncoated or poorly bonded epoxy floors. A CSP 3 diamond-ground and polyurea crack-stitched slab with a 100% solid epoxy base coat and aliphatic polyaspartic topcoat is the minimum specification for a floor that will survive this environment for 10-plus years without delamination. The polyaspartic topcoat's 92 Shore D hardness handles the salt-crystal formation on the floor surface that physically abrades softer finishes, and its hot-tire pickup resistance to 82°C prevents the summer delamination that damages garage floors when a hot vehicle tire sits stationary on an inadequately bonded epoxy coating.

    The Installation Process in Burlington

    1. Free On-Site Assessment

    Same-day free assessments across Burlington cover crack mapping, previous coating identification, surface contamination, and an initial moisture reading. For south Burlington, Roseland, and Tyandaga properties built before 1990, a UV lamp scan and scratch test identify buried paint layers, and an initial surface calcium chloride dome test screens for elevated moisture. Where readings or slab age indicate elevated risk, we schedule ASTM F2170 in-situ relative humidity probes for a 24-hour definitive reading before specifying the system. Written same-day quotes include line-item prep, system, and warranty details.

    2. Surface Preparation

    Diamond grinding to CSP 3 profile with Husqvarna PG 820 planetary equipment removes laitance, oxidation, and paint residue. Active cracks are routed to 1/4 inch width, blown clean with compressed air, and filled with polyurea at 3,500 psi tensile strength. Spalled apron edges receive hydraulic cement fill and grind-flush. ASTM F2170 probes at 40% slab depth deliver a 24-hour reading that determines whether a moisture-mitigation primer at 10-14 mils or a standard moisture-tolerant base coat is applied.

    3. Epoxy Application

    The base coat is roller-applied at 100-200 sq ft per gallon and back-rolled immediately to full wetting with no missed areas or pinholes. Vinyl flake, quartz, or metallic broadcast is applied to rejection from a broadcast basket within the base coat's open time window. After a minimum 12-hour cure at above 10°C ambient, broadcast excess is scraped, vacuumed, and a seal coat applied if specified. The aliphatic polyaspartic topcoat is applied at 2-4 mils, returning to foot traffic in 24 hours and vehicle traffic in 72 hours. The written Warranty activates on the invoice date and covers adhesion failure under normal use conditions.

    Services

    Commercial & Industrial Epoxy Flooring in Burlington

    WSIB-certified systems for warehouses, food plants, showrooms, and parking structures in Burlington. Off-hours installs - no business downtime.

    Commercial & Industrial Epoxy Flooring in Toronto, ON

    Commercial Epoxy

    100% solid commercial-grade epoxy systems shot-blast to CSP 3-4 for facilities running forklifts, food production, or 24-hour operations in the GTA. Pricing runs $3.50-$8 per sq ft installed; off-hours scheduling returns your floor before the next shift. WSIB-certified crews, $2M liability, and full compliance documentation on every project.

    $3.5 -$8 per sq ft installed
    Warehouse Epoxy Flooring in Toronto, ON

    Warehouse Epoxy

    Forklift-rated 100% solid epoxy systems with shot-blast prep, chemical-resistant topcoat, and integrated line marking for GTA distribution centres and logistics hubs. Pricing runs $3-$7 per sq ft installed; large warehouse floors complete in off-hours weekend windows with WSIB-certified crews. WSIB-certified crews, liability, and full compliance documentation on every commercial project.

    $3 -$7 per sq ft installed
    Commercial Kitchen Epoxy Flooring in Toronto, ON

    Kitchen Epoxy

    CFIA-compliant seamless epoxy flooring with 4-6 inch coving, quartz anti-slip broadcast, and zero-VOC chemistry for Toronto restaurants and food service facilities. Pricing runs $5-$11 per sq ft installed; most commercial kitchens complete in 2 overnight shifts with no service disruption. Every install includes full health inspection compliance documentation and off-hours scheduling.

    $5 -$11 per sq ft installed
    Restaurant Epoxy Flooring in Toronto, ON

    Restaurant Epoxy

    Seamless solid-colour, flake, and metallic epoxy systems for Toronto restaurant dining areas, bars, entryways, and washrooms - built for slip resistance, spill resistance, and daily cleaning without tile grout or vinyl seams. Projects run 200-2,000 sq ft from $6-$14 per sq ft installed. Off-hours scheduling available.

    $6 -$14 per sq ft installed
    Retail Showroom Epoxy Flooring in Toronto, ON

    Showroom Epoxy

    High-gloss commercial epoxy with custom RAL colour matching, optional logo inlays, and an aliphatic polyaspartic topcoat rated for 500+ daily foot traffic without scuffing or UV yellowing. Pricing runs $4-$9 per sq ft installed; most showroom floors complete in 2-3 overnight shifts with zero business disruption. WSIB-certified crews with $2M liability coverage on every GTA install.

    $4 -$9 per sq ft installed
    Parking Garage Epoxy Coating in Toronto, ON

    Parking & Hangar

    Traffic-rated polyaspartic and polyurea deck coatings for GTA parking structures - Ontario freeze-thaw rated, salt-impermeable, with integrated line marking and stall numbering. Pricing runs $4-$9 per sq ft installed; phased section-by-section installs keep your garage operational throughout. WSIB-certified off-hours crews with $2M liability on every project.

    $4 -$9 per sq ft installed
    Institutional & Medical Epoxy Flooring in Toronto, ON

    Medical Epoxy

    Seamless antimicrobial epoxy systems with 4-6 inch wall coving and zero-VOC chemistry for GTA hospitals, clinics, schools, and long-term care facilities. Pricing runs $6-$12 per sq ft installed; section-by-section scheduling keeps your facility operational throughout. WSIB-certified crews, $2M liability, and full IPAC Canada compliance documentation on every project.

    $6 -$12 per sq ft installed
    ESD Conductive Epoxy Flooring in Toronto, ON

    ESD Epoxy

    ANSI/ESD S20.20 certified conductive epoxy with copper grounding grid, verified by megohmmeter to NFPA 99 and EOS/ESD Association STM7.1 standards. Pricing runs $7-$14 per sq ft installed; resistance testing and a full compliance report are included on every GTA install. Used in electronics manufacturing, data centres, and cleanroom environments across Mississauga and Markham.

    $7 -$14 per sq ft installed
    Services

    Residential Epoxy Flooring for Burlington Homes

    Garage, basement, decorative, and patio systems built for Ontario winters. Warranty on every Burlington install.

    Garage Floor Epoxy in Toronto, ON Most Popular

    Garage Epoxy

    Diamond-ground to CSP 3 and moisture-tested before a 100% solid epoxy base, decorative quartz or metallic flake broadcast, and a UV-stable polyaspartic topcoat rated for Ontario road salt and hot-tire pickup. A 400 sq ft single-car garage runs $2,600-$4,000 installed and completes in 1-2 days. Every system includes anti-slip grit and WSIB-certified installation.

    $6.5 -$10 per sq ft
    Basement Epoxy Flooring in Toronto, ON

    Basement Epoxy

    Seamless, pet-friendly epoxy flooring for Toronto basements - ASTM F2170 moisture-tested before install, with a built-in vapour barrier primer for below-grade slabs. Pricing runs $4.50-$10 per sq ft installed; most 600 sq ft basements complete in 2 days. Zero-VOC formula is safe for occupied living spaces. WSIB-certified crews on every install.

    $4.5 -$10 per sq ft
    Decorative Metallic Epoxy Flooring in Toronto, ON

    Metallic Epoxy

    Hand-manipulated metallic pigment systems that create a unique 3D liquid-art effect - no two floors identical. Pricing runs $9-$16 per sq ft installed; a 500 sq ft basement or showroom completes in 2-3 days. UV-stable aliphatic polyaspartic topcoat keeps colours vivid under Ontario sun and retail LED lighting for 15+ years.

    $9 -$16 per sq ft
    Polyaspartic Floor Coating in Toronto, ON

    Polyaspartic

    Fast-cure aliphatic polyaspartic floor coating returns most GTA garages to vehicle traffic within 24 hours - 4x harder than standard epoxy topcoats with full UV stability and cold-weather application down to -20°C. Pricing runs $3.50-$7 per sq ft installed; a standard 2-car garage completes in 1 day. WSIB-certified crews and liability coverage on every GTA install.

    $3.5 -$7 per sq ft installed
    Concrete Polishing in Toronto, ON

    Concrete Polishing

    Multi-pass diamond grinding through 1,500-grit with lithium densifier creates a low-maintenance polished concrete surface that reflects light and eliminates wax or topcoat reapplication. Pricing runs $3-$8 per sq ft installed; most commercial floors complete in 2-3 days. Popular in GTA retail, restaurant, and office builds for its 20+ year lifespan.

    $3 -$8 per sq ft installed
    Concrete Repair & Restoration in Toronto, ON

    Concrete Repair

    Structural crack stitching, polyurea injection, spall patching, and self-levelling underlayment to restore any GTA concrete slab to a CSP 3 bondable surface before coating. Crack repair starts at $8-$18 per linear foot; slab resurfacing from $3 per sq ft. CSP 3 surface profile confirmed by grind gauge before any coating is applied.

    $8 -$18 per linear foot (crack repair)
    Epoxy Floor Repair & Recoat in Toronto, ON

    Epoxy Repair

    Full mechanical removal of failed or peeling epoxy back to bare concrete, ASTM F2170 moisture re-testing, and a fresh 100% solid system rated for 10-15+ years on a correctly profiled CSP 3 slab. Full recoat runs $3-$7 per sq ft installed; most GTA garage repairs complete in a 2-day window. We diagnose the root cause first so the new floor doesn't fail the same way.

    $3 -$7 per sq ft installed
    Outdoor Patio Epoxy Coating in Toronto, ON

    Outdoor Epoxy

    UV-stable aliphatic polyaspartic topcoat over a textured non-slip base - rated for Ontario freeze-thaw cycling, road salt, and pool water without yellowing or peeling. A 400 sq ft pool deck or patio runs $3,200-$5,600 installed and completes in 2 days. Every outdoor system includes sealed expansion joint detailing and non-slip quartz aggregate broadcast.

    $4 -$9 per sq ft installed
    Urgent Help

    Emergency Epoxy Flooring in Burlington

    Same-day response for failing floors, water-damaged concrete, and urgent repairs across Burlington and the GTA.

    Same-Day Assessment

    Delaminating epoxy, failing coatings, or a slab emergency - we dispatch same-day across Burlington to assess and quote on the spot.

    Water-Damaged Concrete

    Flooding, burst pipes, or chronic moisture infiltration - we assess slab moisture with ASTM F2170 testing, address the source, and apply a moisture-tolerant system.

    Failing Epoxy Rescue

    Budget epoxy peeling or bubbling? We strip to bare concrete, diamond-grind to CSP 3, and apply a 100% solid system with a warranty - done right this time.

    How It Works in 3 Simple Steps

    Every install follows the same four-step process - no shortcuts, no surprises.

    01

    Free On-Site Assessment

    We inspect your slab, measure the space, and provide a same-day written quote with no obligation.

    02

    Diamond-Grind Surface Prep

    We crack-stitch, level, and ASTM F2170 moisture-test every slab. No prep shortcuts, ever.

    03

    Epoxy Application

    Base coat, decorative flake or metallic broadcast, then a clear polyaspartic topcoat - applied in controlled conditions for full adhesion.

    04

    Return to Service

    Most residential floors are ready in 24-72 hours. We walk you through the care guide and your warranty documentation.

    Pricing

    Epoxy Flooring Costs in Burlington

    Garage Floor Epoxy

    $6.50 – $10/sq ft

    Quartz flake or broadcast + UV-stable polyaspartic topcoat. Includes CSP 3 diamond grinding and ASTM F2170 moisture test.

    • ✓ 400 sq ft single car: ~$2,600–$4,000
    • ✓ 600 sq ft double car: ~$3,900–$6,000
    • ✓ Warranty included

    Basement Epoxy Coating

    $4.50 – $10/sq ft

    Includes vapour barrier primer where needed. Solid colour, flake, or metallic finish. ASTM F2170 moisture testing on every job.

    • ✓ 500 sq ft basement: ~$2,250–$5,000
    • ✓ Decorative metallic: $9–$16/sq ft
    • ✓ Warranty included

    Commercial & Industrial

    $3.50 – $8/sq ft

    Forklift-rated 100% solid broadcast epoxy. CFIA-compliant options for food plants. Off-hours installs, WSIB-certified crews.

    • ✓ Warehouse: custom scope quote
    • ✓ Showroom & retail: from $5/sq ft
    • ✓ No-downtime scheduling

    Free On-Site Quote in Burlington

    We measure your space, assess the slab condition, and provide a written quote with no obligation. Same-day assessment available.

    Get Your Free Quote

    Ready to Start? Get a Free Quote

    Free on-site assessment, no obligation. Warranty in writing. WSIB certified and fully insured.

    Working Across Burlington

    Quick QEW access from our Oakville operations base keeps Burlington on our regular west-GTA route. Same-day free on-site quotes available.

    Burlington Building Types We Know

    Established lakeside homes, new-build executive properties, and detached garage stock with varied slab conditions.

    Why Burlington Homeowners Choose Us

    Garage and basement finishes

    Outdoor pool deck and patio sealing

    Diamond-grind prep on every slab

    Warranty in writing

    Testimonials

    What Burlington Customers Say

    4.9 out of 5, 150+ Google reviews

    "South Burlington lakeside home with a pool deck that was flaking and slippery when wet. Toronto Elite applied a UV-stable, textured non-slip epoxy topcoat over the repaired surface. Two winters and a full summer and it still looks sharp."

    Joanna W.
    South Burlington

    "Millcroft double-car garage with a newer slab - they diamond-ground the laitance, broadcast a full tan flake system, and applied a satin polyaspartic. Cured overnight and has handled road salt season without any lifting."

    Ethan K.
    Millcroft

    "Aldershot basement rec room with persistent dampness issues. Toronto Elite ran ASTM F2170 humidity testing, applied a vapour barrier primer, and installed a seamless quartz-chip finish. Completely dry and easy to maintain."

    Divya R.
    Aldershot

    Burlington Epoxy Flooring FAQs

    How much does a double-car garage epoxy floor cost in Alton Village or Orchard?

    A double-car garage (800 sq ft) with a quartz flake broadcast system and aliphatic polyaspartic topcoat runs $3,200 - $4,500 installed in Alton Village and Orchard. Post-2010 slabs in these subdivisions need minimal prep - one diamond-grind pass and no crack stitching - so more of the budget reaches the decorative system.

    Do you handle basement moisture problems in South Burlington and Roseland before applying epoxy?

    Yes. South Burlington and Roseland basement slabs built before 1980 frequently return ASTM F2170 readings of 80-92% relative humidity - above the threshold for standard epoxy. We install a 100% solid moisture-mitigation primer at 10-14 mils DFT before the decorative system, rated for in-slab RH up to 95%. Skipping this step on a Roseland slab leads to delamination within 18 months in approximately 35-45% of cases.

    Can you install a metallic garage epoxy floor for a LaSalle lakefront property?

    Yes. Executive homes along LaSalle and the south Burlington lakefront consistently specify metallic decorative systems - custom pigment blends with aliphatic polyaspartic topcoats. A triple-car or large attached garage in this area runs $4,500 - $8,500 installed depending on size and finish. We include ASTM F2170 moisture testing for all south Burlington slabs.

    Do you coat warehouse floors in the QEW/Appleby business park?

    Yes. Logistics and distribution warehouse floors in the QEW/Appleby and Burloak/QEW corridor receive 100% solid epoxy broadcast systems at 25-40 mils build thickness, with anti-slip aggregate in pedestrian crossings and semi-rigid polyurea joint sealant at all saw-cut control joints. A 2,000 sq ft section runs $6,000 - $10,000 installed.

    How do you handle older Tyandaga and Brant Hills garages with cracked concrete?

    Tyandaga and Brant Hills garages from the 1980s-1990s typically carry 2-4 shrinkage cracks and occasional apron spalling from road salt on Walkers Line and Dundas Street. We rout and inject active cracks with polyurea at 3,500 psi tensile, repair apron edges with hydraulic cement, and grind to CSP 3 before coating. This prep adds $300 - $450 to the base system cost and is itemised in the written quote.

    Do you install ESD-dissipative epoxy for pharmaceutical facilities in Burlington?

    Yes. Pharmaceutical and medical-device facilities in the QEW/Appleby corridor require ESD-dissipative epoxy at 10^6 to 10^9 ohm-cm resistivity. We supply a certificate of conformance with post-installation Megohmmeter resistance verification to CSA Z317.10 requirements. These systems are quoted separately after a facility floor assessment.

    Our Service Area in Burlington

    Nearby Service Areas

    Contact Us for Epoxy Flooring in Burlington

    Same-day free quotes. Warranty in writing.

    Warranty WSIB certified Free same-day quotes